PROJECT DATA SHEET - RM 20

PROJECT NAME:

PROPOSED HDPE SUBMARINE PIPE CROSSING AT
BATANG PALOH,MUKAH DIVISION,SARAWAK
(DESIGN AND BUILD)
CLIENT :

PPES WORKS (SARAWAK) SDN BHD

LOCATION:
BATANG PALOH,SARAWAK
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

SERVICE PROVIDED:

SUBMARINE PIPELINE

APPROXIMATE CTC VALUE:

RM 12.5 MILLION

START DATE:

APRIL 2010

COMPLETION DATE:

OCTOBER 2010

PROJECT DESCRIPTION:
The contract for the design,construction and completion of 355mm TWIN HDPE SUBMARINE WATER PIPELINE and ancillary works from Tanjong Manis to Pulau Bruit of Mukah Division was awarded by the Ministry of Rural and Regional Development,Malaysia (Kementerian Kemajuan Luar Bandar dan Wilayah ,Malaysia)

Wibawa Works was engaged by PPES Works (Sarawak) Sdn Bhd for the laying of submarine pipeline project of 355mm TWIN HDPE WATER PIPELINE to supply fresh water to Pulau Bruit in Sarawak,Malaysia. The overall work for this project comprised of two strings of 355mm OD HDPE submarine water pipeline at a length of 1,100 meters

The major processes of the river crossing submarine pipeline were identified as below:

- Mobilization of Pipe Laying Spread
- Preparation and Pre-installation works
- Double Joint of HDPE Pipes
- Shallow Water Pipe Laying
- Deep Water Pipe Laying (Submarine Pipe Laying)
- GPS Marking of Submarine Pipelines Laid
- Additional Protection System (anchoring) of Submarined Pipelines
- Hydrotesting of Submarined Pipelines
- Backfilling of Pipelines

OTHER SIMILIAR PROJECTS:
Submarine_Pipeline_Penang

Submarine_Pipeline_LAP

submarine_pipeline_kklw

WIBAWA WORKS SDN BHD
37-5 Block H, Jalan PJU 1/37, Dataran Prima, Petaling Jaya          Selangor, Malaysia
Phone :   +603 7804 8066
Fax :        +603 7804 8193
Email:      wibawaworks 'at' wibawa.com.my