PROJECT DATA SHEET - RM 13

PROJECT NAME:

SUPPLY, LAY AND FIX LAND & SUBMARINE PIPELINE AND ASSOCIATED WORKS FROM BAYAN BARU HIGHWAY TO PULAU JEREJAK, PULAU PINANG
CLIENT :

PERBADANAN BEKALAN AIR PULAU PINANG

LOCATION:

PULAU JEREJAK, PULAU PINANG, MALAYSIA

 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

SERVICE PROVIDED:

ENGINEERING &
CONSTRUCTION


CONTRACT VALUE:

RM 18.5 MILLION


START DATE:

APR 2005

COMPLETION DATE:

JAN 2006

PROJECT DESCRIPTION:
The works involved installation of Twin Submarine 900mm Steel Pipeline from Bayan Baru highway,to Pulau Jerejak, Penang. The pipeline catered treated water to the resevoir to be constructed at Pulau Jerejak.The storage reservoir will be utilised as an additional storage during interruption of water supply.The works was divided into two stages:First stage involves On-Shore construction whereas the second involved Submarine Pipeline installation

The major works in this project carried out by Wibawa Works are:


i. On-Shore Pipe Laying
ii.Off-Shore Bottom Pull Installation of Twin Sub Marine Pipe Line at water depth of 25m
iii. Dredging pipe trench in sea
iv. Pipe Jackings works for road crossing
iv. Cathodic Protection System.
v. Connection to existing main pipeline
.
OTHER SIMILIAR PROJECTS:submarine_pipeline_lap

submarine_pipeline_sarawak

submarine_pipeline_penang
.
WIBAWA WORKS SDN BHD
37-5 Block H, Jalan PJU 1/37,
Dataran Prima, Petaling Jaya
Selangor, Malaysia
Phone :   +603 7804 8066
Fax :       +603 7804 8193
Email:      wibawaworks at wibawa.com.my

   
 
Copyright WIBAWA WORKS SDN BHD . Powered by xolutions dot biz